Results, Reports & Publications
To meet environmental conditions at an Offshore Wind Farm project in Taiwan, where Seaway 7’s Seaway Yudin will install the pin-piles, a Pile Installation Frame (PIF) is required. This PIF has been lifted and loaded this morning in Rotterdam, the Netherlands and will be transported to Taiwan.